Attention: Please select the correct tab below (either Shoreline or Kenmore/LFP) depending on the location for the permit.

City of Shoreline - Fire System Permits

Generally, all work being performed on a fire protection system requires a fire permit. Most work will require a full submittal and plans review, but some smaller work may be an over the counter permit.

Permits we issue:

  • Fire Sprinkler and Fire Pump
  • Fire Alarm
  • Stairwell Pressurization
  • Emergency Power Supply Systems
  • Emergency Radio
  • Underground Fire Service Main
  • Hood Suppression Systems
  • Emergency Power Supply Systems
  • Commercial Tanks
  • Temporary Tents and Canopies

For fire permits located within the City of Shoreline:  All permits whether full submittals or over the counter are through the City of Shoreline Planning and Community Development. For instructions on submitting an over the counter contact the Fire Marshals Office (contact info below).

Kenmore/Lake Forest Park - Fire System Permits

Generally, all work being performed on a fire protection system requires a fire permit. Most work will require a full submittal and plans review, but some smaller work may be an over the counter permit.

Permits we issue:

  • Fire Sprinkler and Fire Pump
  • Fire Alarm
  • Stairwell Pressurization
  • Emergency Power Supply Systems
  • Emergency Radio
  • Underground Fire Service Main
  • Hood Suppression Systems
  • Emergency Power Supply Systems
  • Commercial Tanks
  • Temporary Tents and Canopies
  • For Special Use Permits please contact the Fire Marshal’s Office

Apply for a Fire Permit Online (for projects in Kenmore/LFP only)

For permits located within the Cities of Kenmore and Lake Forest Park:  Application forms can be downloaded via the PDF links below and dropped off at Station 51 – 7220 NE 181st Street, Kenmore.

Sprinkler Systems

Full Submittals
Any new system, or existing system with over 12 new or relocated heads.

Over the Counter
Generally, existing systems with new or re-located heads up to 12, unless there is a change is design density flow area.

Fire Alarm

Full Submittals
New systems , or existing system with over 12 new or relocated heads.

Over the Counter
AES installations. Existing systems with new or re-located heads up to 12.

Smoke Control/ Stairwell Pressurization

  1. A Conceptual Analysis is required with the building permit submittal.
  2. A deferred smoke control submittal is required to install.

For questions or more information, contact the Fire Marshal’s Office at:

Phone: 206.533.6565
Email: fmo@shorelinefire.com